out/model.md
Saved at r/cirkeltrek: 6.1 local model, R6. This reading copy substitutes participant identifiers in saved text; it is not a new interview response. Reading Markdown.
Participant handles in these reading copies use the pixel stream's identifiers: base64(SHA1(username)), case preserved, without a salt. These are linkable pseudonyms. Profile links are removed; missing-author markers remain. Original research files are unchanged. Quote offsets refer to original text. Source and reading-copy hashes are listed separately.
Source commit: c070d990be88, 2026-10-23T12:38:38+02:00. Saved-state date: not recorded. Not recorded in the catalogue; source commit date is not a close date. Commit date and saved-state date are distinct.
Declared saved-state supplement. Member: workspace/out/model.md. Original SHA-256: 90aee11fd5736e768c9b74cbfc44d3aa7a79e8c9a01329b88e8048db8318aa14. Reading-copy SHA-256: 90aee11fd5736e768c9b74cbfc44d3aa7a79e8c9a01329b88e8048db8318aa14.
Dynamic model — post-critic pass 2
Explanation
Cirkeltrek's text shows organizing in specific answered undertakings,
not a unified force inferred from orange language. Readers are offered
entry, a concrete object and a current plan (P01). A
newcomer can be willing yet not know how to help; a later reader cannot
find the current portrait plan. Availability and participation are
different achievements. Proposals for letters, windmills, portraits and
borders specify what to act on, while disputes and revisions keep the
goal open. No founding moment or single decision system is
recovered.
The most legible local action is a repair. In E-02,
named partners agree a moment and complementary pixels
(P02), then acknowledge success (P03) [A01].
Its supporting words are “om 13:05 ga ik met 2 profielen twee blokjes
veranderen, als je dit ook om 13:05 precies doet kunnen we de letter
naar een O veranderen” in c0027, item dfoskt3,
hour 18.953333333333333, and “Yes, gelukt! High-Five!” in
c0071, item dfosqu9, hour 19.10388888888889,
both thread 62rwzd. The full replies connect those
endpoints by divided intentions. This supports reported local
completion, not direct canvas verification. A later report of reversal
returns contributors to correction, but does not supply a complete typed
feedback cycle.
Accountability is also work, and can change its own target. A named
alleged saboteur (P04) answers that they are restoring
black pixels, whereupon the accuser apologizes (P05) [A02].
In E-04, “Dat ben ik niet, ik probeer 't juist steeds weer
zwart te maken” (c0078, item dfowkrg, hour
21.656111111111112) receives “Ah, excuus. Dit maakt het wel moeilijk om
betrouwbaar /r/cirkeltrek -verraders te vinden” (c0079,
item dfowq9p, hour 21.735833333333332), thread
62sk70. Rendering lag remains the participant's
explanation. E-03 supplies a different result: release “een
beetje uit medelijden” rather than proven innocence. The model preserves
the distinction instead of equating all sanctions with effective
repair.
Calls to annex and proposals to spare neighbours contest a project's
reach (P06); they are rival practices, not an evolution to
consensus. The specific no-expansion exchange in E-05 ends
in reported loss. The Pusheen exchange (E-11) promises
preservation, then its own promiser says others disagree.
K01 names that limit: an undertaking by a speaker is not
demonstrated control over every placer. “We have no control over our
people” (c0306, item dfpe692, thread
62vffi, hour 28.979166666666668) is a participant's
explicit explanation, not a measured universal condition. These
contrasts prevent an arrow from agreement to enforced territorial
restraint. Whether an earlier binding arrangement existed elsewhere
remains unresolved.
After hour 73, original-canvas placing cannot continue under the
imposed clock. Appraisal and preservation (P07) make a
result available through the header request, wallpapers and compilation;
these do not establish continuing pixel production. Replacement-venue
offers repeat P01, but the in-window Nah in
E-23 refuses. The last observed coordinating act remains
c0299 at instrument hour 94.53666666666666; it dates an
attempt, not the end of all activity. Work-remained reports and the R2
aftermath calculation retain their separate meanings.
Elements, tier and range
The authoritative register is model/elements.jsonl: P01
offers work (T4-001); P02 schedules
complementary repair (T4-002); P03
acknowledges completion (t05); P04 calls to
account (T4-002); P05 revisits
attribution/sanction (t05); P06 contests reach
(T4-003); P07 interprets/preserves result
(T4-004); P08 calls for restoration/guarding
(T4-002); K01 limits the reach of speakers'
undertakings (D01). Each row specifies its range and coded
evidence. P03 also uses construction reports as an edge
variant without importing their original coder theme into another higher
theme. P01 and P06 name K01 as a
bound. No authoritative leader or stable representative role is
inferred.
Relationships and negative tests
A01: P02 to P03, transition,
fair, bounded. Complementary timing makes the repair jointly actionable;
incompatible or refused action would defeat that mechanism.
E-23 defeats the broad offer-to-uptake expectation, not the
narrower accepted repair. E-06 has no joint timing;
E-17 has no visible response; E-23 lacks
complementary repair and a shared time. None tests failure of the
retained mechanism, whose negative check is not-addressed, not tested
absent. This is a quote-grounded sequence, not an interval measurement
or a frequency result.
A02: P04 to P05, transition,
fair, bounded. An answer supplies a competing account that an engaged
challenger can acknowledge; ignoring it and maintaining the same
attribution would defeat that mechanism. E-17 does not
expose an ignored answer, so the negative test remains weak, not tested
absent. E-03 qualifies release as pity. Neither relation is
strong; live/aftermath numerical comparisons and a prevalence base-rate
test are not claimed. Full mechanisms, failure clauses, samples and
counterexample responses remain in arrows.jsonl. The model relates
presences and specific sequences, not amounts.
For coder-selection artefact: both relations sit in correction
material that the original coder chose to preserve. A01 may
be unusually legible because a success reply was coded. The full
thread's divided intentions and later reversal distinguish it from a
bare success label, but do not show how representative it is.
A02 may be memorable because the accusation was wrong. The
explicit denial/apology and different shame-wall release show the local
connection, not its incidence. There is no third grounded arrow for
which to invent an argument. Chronology in the original case was read at
receipt 3300; it corroborates the repair/accountability and promise
exchanges but supplies no independent causal observations.
Dimension projection
Both retained arrows run between process elements within
D01; one endpoint in each is specified at coder-theme
level. Their mechanisms cannot be abstracted into a single causal
relation from D01 to itself: scheduling and reattribution
are different. Report them as internal qualitative mass, not a
dimension-level self-arrow. The register has no incoming or outgoing
cross-dimension relationship; there is only one dimension, and
P07 lies outside it. No coder theme has duplicate
placement, so removing doubles changes nothing. No quantitative
connection mass or drift estimate is asserted. Lack of an incoming
dimension arrow does not turn this single case's entire dimension into a
causal condition.
ungrounded relationships
A published plan causing acceptance; national language producing
mobilization; bargaining causing compliance; an agreement changing the
whole community's mind; correction producing durable defence; results
causing renewed recruitment; and closure causing durable migration are
not grounded arrows. Their components can be described, but these causal
formulations are not drawn. The displayed model without them is
P02 to P03 [A01] and P04 to
P05 [A02], alongside P01, P06,
P07, P08 and K01. Adding the
conjectures would yield a tidy plan-to-compliance-to-survival chain;
that is the rejected theorized model, not an additional set of
registered arrows.
Dynamics and boundaries
No loop is claimed: loops.jsonl is empty. E-02
explicitly returns to a damaged-letter problem, but repeated work is not
a closed sequence through the typed arrows. Public accounting can end in
retraction, a pity release or no visible reply. A promised border can
fail without dissolving the venue. Hour 73 irreversibly removes
original-canvas placing, not display work, care or the possibility of
another venue.
The model should break where a binding decision/membership
arrangement makes a speaker's undertaking enforceable over the relevant
actors, or where apparent shared work is unrelated projects with no
reciprocal engagement. An unchanged statement would not explain those
conditions. These are substantive boundaries, unlike the mere size of
the archive. The ordinary, surprising and stopped episodes are narrated
above; P08 additionally tells the overnight protection call
and contextual commitment without claiming a finished watch. All
remaining episodes are tested in the numbered story episode registers,
with irreducible residue retained rather than absorbed.
looked-for-and-not-found
The pre-search competing account was public relay without local
organizing. Literal case-sensitive searches of coded words for gelukt
and excuus returned the specific repair acknowledgment and apology;
their full threads are read in the story census. A controle search
returned no match in that coded vocabulary. This null cannot establish
absent control: the English explicit control statement exists and
external decisions are unobserved. The strongest contrary item to
binding reach is the Pusheen promiser's later “Well, seems others don't
agree. :(” in dfq7a8j, hour 45.92388888888889, thread
62z31i, followed by visitors' reported relocation. It
changes an achieved-border account into an attempted-bargain account.
The relay rival survives for external plan decisions and unobserved
placement; it does not explain away the local divided repair and
acknowledged reattribution. No complete governance system, durable
migrated team, feedback cycle or independently verified image outcome
was recovered. All such absence statements are weak and scoped to the
read public text and window, not proof of nonexistence elsewhere.
Unused practices and concept
t01, turning the subreddit itself into the April joke,
is contextual and outside the model. Other original coder practices are
represented by at least one process, but this is not a code-coverage or
claim-support count. The whole tier is not forced into D01:
T4-004 remains outside it. No novel concept is selected;
concept.md retains the closest accountability candidate and rejects a
whole-story label.
Story-test residue
The complete census retains E-18 as told-with-residue:
its guide is an offer, but the in-window post-closure collaborative
anthem recitation is ritual conversation rather than pixel production or
display coordination. It would require a separate account of collective
performance, not an extra causal arrow about plans. The model does not
absorb it into continued canvas work. The contrary instruction in
62ryzp, item dfoyxq7, hour 22.77638888888889,
says named people need not defend themselves, only change behaviour;
A02 therefore remains an observed possible reattribution,
not the definition or inevitable outcome of accountability.
Independent critic and revision
The accepted critic found two contradictions, both repaired with
their prior records retained. Canonical coding places c0049
in t05, so the misplaced example under the earlier
t06 section was replaced, not recoded. A01 no
longer calls E-23 a failure of its narrow mechanism: the
repair/timing antecedent is absent there. Its instance survives, but its
negative test is weak and unaddressed. The rival
access/intelligibility/claims/presentation partition is plausible; the
present partition is retained to distinguish making work addressable
from recovering its continuity and contesting its entitlement. The full
comparison and replies are in notes-R4.md. Candidate pass 1 remains
preserved. This corrected model is compared in the post-fix passes;
version selection and the stopping record are reported in
notes-R4.md.